What is an 8/6 roster?
An 8/6 roster is eight days on followed by six days off, repeating every fourteen days. It is common where travel to site makes short blocks wasteful and where the work runs seven days a week. This guide explains how the hours add up, how two crews cover a site between them, and the checks that matter before a block roster goes live.
Block rosters are named after their arithmetic: 8/6, 2/1, 4/3, 14/7. The first number is days worked and the second is days off, and the pair repeats. The 8/6 is one of the more common shapes because it lands on a fourteen day cycle, which is also how most businesses pay people.
An 8/6 roster is a block pattern in which an employee works eight consecutive days and then takes six consecutive days off, repeating on a fourteen day cycle. Because the block is not seven days long, the days worked move through the week, so weekends rotate on their own without a separate weekend pattern. What it adds up to depends on the shift length: eight days of 8 hours is 64 hours a fortnight, eight days of 10 hours is 80, and eight days of 12 hours is 96, which averages 48 hours a week. Where the average passes 38 hours a week, the additional hours have to be reasonable, and how they are paid comes from the award or enterprise agreement that applies.

Where an 8/6 earns its place
A block roster is worth the complexity in a narrow set of situations, and it is a poor fit outside them.
- Travel to site is expensive or slow. If getting somebody to work takes half a day, a two day block wastes most of it and an eight day block does not.
- The work runs seven days. A pattern built on a fourteen day cycle covers weekends without anybody having to be assigned to them.
- The site is remote or residential. Where people are away from home, a long block followed by a long break is often preferred to short blocks with short breaks.
- Continuity within a job matters. Eight consecutive days means fewer handovers inside a task than eight days scattered across a month.
Against that, a block roster concentrates fatigue, makes a single absence harder to cover, and interacts awkwardly with anything that happens on a fixed weekly rhythm. Shift work and fatigue covers the first of those, and it is the one that needs a plan rather than a hope.
What the hours add up to
The pattern alone does not tell you the hours. The shift length does, and it is worth writing the number down before anybody agrees to anything.
| Shift length | Hours in the 8 day block | Average a week | Against 38 hours a week |
|---|---|---|---|
| 8 hours | 64 | 32 | Under |
| 9.5 hours | 76 | 38 | Exactly at it |
| 10 hours | 80 | 40 | Over by 2 |
| 12 hours | 96 | 48 | Over by 10 |
The Fair Work Ombudsman’s maximum weekly hours fact sheet explains that an award or agreement may allow hours of work to be averaged over a period longer than a week, and that the average weekly hours over the period must not exceed 38 for a full-time employee, unless the additional hours are reasonable. For employees who are free of any award or agreement, an employer and employee may agree in writing to average ordinary hours over a period of up to 26 weeks.
So a 12 hour 8/6 is not automatically unlawful, and it is not automatically fine either. It rests on an averaging arrangement that permits it and on the additional hours being reasonable, which is judged on factors including any risk to health and safety, the employee’s personal circumstances, the needs of the workplace, the notice given, whether the employee receives overtime or a level of remuneration that reflects an expectation of working additional hours, and the usual patterns of work in the industry.
The rules that apply are usually not a modern award
Most of the industries that run 8/6 rosters, particularly resources and large construction, work under enterprise agreements rather than directly under a modern award, and those agreements set their own ordinary hours, cycle lengths, rates and travel arrangements. That is the first thing to establish, because an answer taken from an award can be the wrong answer entirely.
- Find the instrument that actually appliesAn enterprise agreement, a modern award, or neither. The Fair Work Ombudsman’s Find my award tool is the starting point, and the Fair Work Commission holds the register of agreements.
- Read its hours of work clause before its pay clauseOrdinary hours, the cycle it is averaged over, the daily maximum and the span are what make the pattern legal or not.
- Write down what is ordinary and what is overtimeIn a 12 hour block roster this is the difference between two very different wage bills, and it should not be discovered on the pay run.
- Check the shoulders of the blockThe last shift before the break and the first shift after it are where the minimum break between days and any travel time collide.
- Decide how travel is treatedWhether travel to and from site is paid, and whether it counts as time worked, comes from the agreement or contract, not from the roster.

Two crews, one site
An 8/6 covers eight days out of every fourteen, which is more than half a cycle. Two crews offset by seven days therefore cover a site continuously, with two days of overlap every cycle that are useful for handover.
| Day of cycle | Crew A | Crew B | On site |
|---|---|---|---|
| 1 | Working (day 1 of 8) | Working (day 8 of 8) | Both: handover day |
| 2 to 7 | Working | Off | Crew A |
| 8 | Working (day 8 of 8) | Working (day 1 of 8) | Both: handover day |
| 9 to 14 | Off | Working | Crew B |
| Next cycle | Starts again at day 1 | Starts again at day 8 | Continuous |
The two overlap days are the reason this shape is popular rather than an accident of the arithmetic. A block roster with no overlap hands a site from one crew to another through a document, and a document is a worse handover than a day. Shift handover notes covers making the written part of that work when an overlap is not possible.
Where the work also runs at night, the same structure doubles: four crews, two on days and two on nights, each on its own 8/6. That is a bigger commitment than it looks, because it also means deciding how and how often people move between day and night blocks. What is a rotating roster covers the direction and speed of that movement.
What an 8/6 does to everything else
| The problem | The decision to make | |
|---|---|---|
| Absence | One person missing from a block is eight days short, not one | Who the standby is, and whether they come from the off-cycle crew or from outside it |
| Annual leave | A week of leave covers part of a block and part of a break, so the hours deducted are not the hours taken | How leave is counted against a block roster, written down before anybody applies |
| Public holidays | A holiday in the off block and a holiday in the work block produce very different answers | What the agreement says about public holidays falling in each, and the public holiday dates for the state |
| Fatigue | Day eight of a block is not the same as day one, particularly on 12 hour shifts | Whether tasks are sequenced so the demanding ones fall early in a block, and how travel home is managed on the last day |
The last row is the one with a legal edge as well as a practical one. Safe Work Australia treats fatigue as a work health and safety hazard that an employer has a duty to manage, and a long block of long shifts followed by a drive or a flight is exactly the situation that duty is about. Late finishes and getting home covers the end of a shift as part of the shift.
Roster Flow records the cycle you publish and the hours people actually clock. It does not interpret an award or enterprise agreement, decide whether an averaging arrangement is permitted, or calculate pay. Those stay with your payroll system, the Fair Work Ombudsman or a workplace relations professional.
Other block patterns, and when they fit better
- 2/1. Two weeks on, one week off. A three week cycle, which does not line up with a fortnightly pay period and so needs the hours averaged over a longer window.
- 4/3. Four on, three off, on a seven day cycle. The simplest block pattern to publish, because the days worked stay the same each week, which also means the weekend never rotates.
- 14/7. The same ratio as 2/1 expressed in days, common where travel is very long.
- [4 on 4 off](/templates/four-on-four-off-roster). An eight day cycle, which rotates through the week quickly and spreads weekends evenly over two months.
- 9/5. Nine on, five off, also on a fourteen day cycle, with a longer block and a shorter break than an 8/6.
The FIFO roster template and the shift pattern generator both build a cycle from a pattern you describe, which is the quickest way to see what a shape does to a quarter before committing to it.
Roster Flow publishes a repeating cycle to everybody at once, takes availability and leave from staff on their own phones, turns clock ins into timesheets, and sends approved hours to Xero or a CSV file.
A checklist before an 8/6 goes live
- The instrument that applies is identified: enterprise agreement, modern award, or neither
- The shift length is decided, and the average weekly hours have been written down
- An averaging arrangement that permits the cycle is in place where one is needed
- What counts as ordinary hours and what counts as overtime is settled in advance
- The shoulders of each block meet the minimum break between days
- Crews are offset so that cover is continuous, with a handover day where possible
- There is a written answer for leave, public holidays and absence inside a block
- Fatigue and the journey home on the last day of a block have been planned for
Questions
What does an 8/6 roster mean?
Eight consecutive days worked followed by six consecutive days off, repeating on a fourteen day cycle. Because the block is not seven days long, the days worked move through the week, so weekends rotate without a separate pattern.
How many hours is an 8/6 roster?
It depends on the shift length. Eight days of 8 hours is 64 hours a fortnight, eight of 10 hours is 80, and eight of 12 hours is 96, which averages 48 hours a week.
Is a 12 hour 8/6 roster allowed in Australia?
It depends on the award or enterprise agreement and on whether the additional hours are reasonable. An award or agreement may allow hours to be averaged over a period longer than a week, and the average must not exceed 38 hours a week for a full-time employee unless the extra hours are reasonable.
How many crews does an 8/6 roster need for continuous cover?
Two, offset by seven days. Each crew covers eight days of the fourteen day cycle, which leaves two days each cycle where both crews are on site and a handover can happen face to face.
How does annual leave work on a block roster?
A period of leave covers part of a work block and part of a break, so the hours deducted are not the same as the calendar days taken. Decide and write down how leave is counted against the cycle before anybody applies for it.
What is the difference between an 8/6 and a 4 on 4 off roster?
The cycle length. An 8/6 repeats every fourteen days, which lines up with a fortnightly pay period. A 4 on 4 off repeats every eight days, which moves through the week faster and spreads weekends more evenly over a longer period.
Sources
- Fair Work Ombudsman: maximum weekly hours
- Fair Work Ombudsman: hours of work
- Fair Work Ombudsman: rosters
- Fair Work Ombudsman: find my award
- Fair Work Ombudsman: not working on public holidays
- Safe Work Australia: fatigue