Rostering software for function centres

The roster follows the bookings. A hundred people on Saturday and nothing on Tuesday, a casual pool far larger than the shifts on offer, and nights that finish long after the last guest.

Riverside Function Centre
A sample week for Riverside Function Centre
WhoWedThuFriSatSunMon
Sofia D.Supervisoroff4–113–1212–110–6off
Lucas P.Baroff5–115–124–111–6off
Hana Y.Waitoff5–11off4–111–6off
Kirra D.Waitoffoff5–124–1offoff
Sam T.Set up9–3off1–610–4off9–2
Marisol D.Kitchenoff3–103–1111–1210–5off

Saturday is a wedding: set up from ten, service from four, pack down to one. Monday is the reset.

A sample week. Invented names, typical hours.

What makes a function centre hard to roster

Four things that come up in every one of these weeks, and what happens here instead.

The headcount is different every weekBuild each week from the bookings rather than from last week, or copy last week and change what moved. Either way the estimated cost of the crew adds up as you place it.
Two rooms running at onceSet each room up as a venue. The roster, the timesheets and the reports follow the room you pick, and the totals roll up across both.
Pack down runs past midnightA shift that finishes at 1:30am is one shift with its hours counted through the change of date, and a missed clock out at the end of it comes up first on Monday.
Half the casual list is new every seasonAdd somebody, send the invite, and they set their own password on their phone. Deactivate them when they stop working and they stop counting towards your plan.

What changes once it is running

What function centres get back, in the terms this trade measures it in.

A hundred on Saturday and nothing on TuesdayA roster built around the bookings rather than around a pattern that does not describe your trade.
Pack down is counted, not roundedThe hours that run past midnight are the hours that get approved and paid.
A new casual costs one invitationThen they maintain their own availability, which is the admin you were doing for them.

A week in a function centre

Early weekBookings confirm. Crew sizes decided per room and per event.
ThursdaySmaller functions and corporate evenings. One room, one crew.
FridaySet up for the weekend while a function runs in the other room.
SaturdayThe main event: set up from the afternoon, service, then pack down past midnight.
SundayA daytime function, a shorter crew, and the room reset for Monday.
A waiter setting a table with covered silver dishesStaff serving food at an indoor eventA bartender working behind the bar

What it is used for in a function centre

Specific things people in this trade do with it, rather than a list of modules.

  • Each room set up as its own venue, so two events on one night are two rosters
  • A supervisor per room who publishes and approves for their own night
  • Pack down shifts that finish after midnight, counted as the hours they take
  • A crew built for one event and never rostered again, without cluttering the team
  • Set up, service and pack down as three shifts rather than one twelve hour block
  • The estimated cost of a night beside the number of guests it was staffed for

Two rooms, one crew, and a pack down that ran past one

A 200 seat room and a 60 seat room, both booked on the same Saturday.

Two rooms, one crew, and a pack down that ran past one: when each thing happened, what happened, and what was done
WhenWhat happensWhat you do here
WednesdayThe smaller room adds 20 guests.Two more shifts go on that room’s roster, and the estimate for the night moves with them.
Saturday 3pmSet up starts in both rooms with a shared crew.Each person is rostered to the room they are actually in, so the totals stay honest.
Saturday 10:30pmThe small room finishes. The big room has not.Three people move across. New shifts, not a note in somebody’s phone.
Sunday 1:15amPack down finishes.The clock outs land after one. Every shift crossed midnight and each counts as one shift.
Sunday 11amFour people never clocked out, because at one in the morning nobody does.They are first on the timesheet, with the rostered finish offered and the reason recorded.

Two events, one crew across both rooms, and a Sunday morning that took ten minutes.

The jobs that stop being jobs

Where the hours in a week like this go. No stopwatch: the left column is what the work takes without it, and the right is what is left of the same task.

Each job, the way it usually goes, and what it becomes here
The jobUsuallyHere
Running two events on one nightOne roster, and no idea which room cost whatA venue per room, with the totals kept apart and added up together
Moving a crew between rooms mid eventA decision on the floor that nothing recordsA shift in the room they moved to, added while it happens
A 1am pack downClock outs nobody did and hours somebody guesses atMissed clock outs flagged first, fixed with a reason attached
Staffing to a guest numberA rule of thumb and a look at last yearShifts added against the night, with the cost as you add them

What the record shows, and what stays yours

Roster Flow keeps the record. Meeting the obligation is still the workplace's job, and these are the parts of it nothing here decides for you.

What is recorded, on the day it happens
  • Which room each shift belonged to, on a night with more than one event
  • Shifts crossing midnight, counted once and not split at twelve
  • Missed clock outs and the fix applied to each, with its reason
  • Who supervised and approved each event’s hours
  • The estimated cost of a night beside the hours actually worked
What is still yours to decide
  • Penalty rates after midnight and on a Sunday, which payroll applies
  • Minimum engagement for a crew called in for four hours
  • Anything the client contract says about staffing levels
  • Whether a pack down that ran an hour over is approved as worked

What has to be kept, and for how long, is set out by the Fair Work Ombudsman. Nothing here interprets an award or certifies that a workplace complies with one.

Who is usually on the team

A small permanent team and a long casual list, drawn on per event, with supervisors who run a room.

What drives the wage cost

Late nights and weekends at the loadings you set. Because a function is staffed as a block, the day total on the estimate is the number worth checking before the booking is confirmed.

The estimate uses the rates and loadings you enter. It is a planning figure for the week, not a pay calculation, and it does not interpret an award.

Questions people in function centres ask

Can we roster two rooms at once?

Yes. Each room can be a venue with its own roster and its own clock in radius, and staff can be assigned to more than one.

How do casuals get their shifts?

Publishing sends the shift to their phone and unlocks clock in for it. A reminder goes out before each shift at the interval you set.

Somebody worked who was not rostered. What happens?

They can still clock in. It is marked as unrostered and waits for a manager to approve, so a last-minute extra pair of hands is not a hole in the record.

The headcount is different every week. Can I roster to the booking rather than to a pattern?

Start from last week so the shape is there, then add or take out the shifts the booking needs. The estimate moves as you go, so a hundred and twenty covers is a wage figure before it is a roster.

Pack down runs past midnight. Does that count properly?

A shift that starts at 5pm and finishes at 1am is one shift of eight hours rather than two days, and somebody clocking out at ten past one is doing exactly that rather than appearing to work a day and a half.

Half the casual list is new every season. How much admin is that?

Adding somebody is an invitation, or an import from Xero so the names already match payroll. They keep their own availability from then on, and deactivating a casual who has moved on stops them counting towards your plan that day.

Run something broader than a function centre? The pubs and clubs page covers the whole trade, including the parts this page does not.Pubs and clubs

Other trades, other weeks

Get next week's roster out tonight

Add your venue and your team, build the week, and publish it. Payroll can be connected later.

Start freeQuestions? Contact us
Free for up to 5 staff, permanently. No card to start.